Get ready for Martyn's Law with an accurate picture of your venue
Plans for evacuation, invacuation and lockdown are only as good as the information behind them. We create a precise 3D model of your premises and map everything your procedures depend on, so your plans are built on fact, not old drawings.
What the law asks of you
Which tier applies depends on how many people may be on your premises at the same time at the busiest times.
Standard tier
- Tell the SIA who the responsible person is
- Have procedures for evacuation, invacuation, lockdown and communication, as far as reasonably practicable
Schools, colleges and places of worship stay in the standard tier however many people attend.
Enhanced tier
- Everything in the standard tier
- Public protection measures for monitoring, movement of people, physical security and security of information about the premises
- Document your procedures and measures, assess how they reduce risk, and send this to the SIA
Every requirement, mapped in 3D
Our surveyors, with their fire safety and evacuation experience, scan your premises and tag everything your procedures rely on. AI drafts each record and our team checks it, so your plans are based on what is actually on site rather than on assumptions.
From scan to ready
- 01ScanInside and out, with drones for large sites and their approaches. People can be blurred or removed from the model.
- 02TagExits, routes, safe rooms, lockable doors, CCTV, PA points and barriers, checked by our team.
- 03Plan & trainProcedures, roles and staff briefings built on an accurate model of your premises.
- 04Keep currentChanged areas rescanned and merged into your model, so plans keep pace with the building.
Who's likely to be in scope
Publicly accessible premises where 200 or more people may be present at the same time, such as:
- Theatres and cinemas
- Stadiums and arenas
- Shopping centres
- Hotels and conference venues
- Schools and colleges
- Universities
- Places of worship
- Hospitals
- Council buildings
- Museums and galleries
Your security information stays secure
A detailed model of exits, lockdown points and CCTV coverage is sensitive. Protecting it is part of the law for enhanced-tier premises, and part of how we work for everyone.
- Access only for the people you approve
- Secure, access-controlled hosting
- Confidentiality agreements as standard
Start preparing now, not in spring 2027
Tell us about your premises and we'll explain what you're likely to need and how we can help.
This page is a general overview, not legal advice. Check the Home Office statutory guidance and the SIA's guidance for how the law applies to your premises.