Case study · Local authority

140 sites scanned and compartmentation drawings delivered in 12 weeks

A council needed accurate compartmentation drawings across its estate before installing new fire doors and carrying out fire-stopping works.

140sites
28,000 m²captured
140drawings, plus VR twins
12 wksstart to finish, on schedule

The challenge

The council was about to begin a programme of fire door replacement and fire-stopping works across 140 sites. Before contractors could start, it needed accurate compartmentation drawings for every building, and existing drawings could not be relied on.

What we did

We scanned every one of the 140 sites and produced a compartmentation drawing for each, showing compartment lines, fire-resisting construction and fire door locations.

Alongside the drawings, every building received a VR twin. These supported the council's dilapidation reports and gave it a lasting visual record of each site before works began.

The result

All 140 drawings and twins were delivered within the agreed 12-week timescale, giving the council and its contractors an accurate basis for the fire door and fire-stopping programme.